Easier to operate than ever with over 15 new features.
Eliminate the need for motors and trusses on the permanent 2''
(50 mm) pipe grid to allow for more stage clearance. Rig at deck
level and raise the roof with 8,000 lbs (3,630 kg) of sound, lights
and banners using the double-mast system.Benefit from a total roof
rigging capacity
of 12,000 lbs (5,443 kg).
NEW
GENERATION
Simplify
staging
STAGELINE
SL250 gallery
A great piece of equipment just got that much
better.
Courtesy of JHE Production Group
THREE EASY STEPS AND THE STAGE IS READY FOR YOUR
EVENT
The wait is over: now you can have fully hydraulic
set-up at deck level for stage, sound, lighting equipment,
banners and sets.
STEP
1
Level
the trailer and lower the floor panels.
Easy
hydraulic operation.
STEP
2
Install
sound, lighting equipment and banners at deck level.
Attach up to 8,000 lbs to standard 2" tube trussing
in roof. (3,630 kg to 50 mm tubing)
STEP
3
Raise
the roof using the hydraulic double-mast lifting mechanism.