SL250 New Generation - Mobile Stage

Stageline SL250NG portable Stage. Easier to operate than ever with over 15 new features. Eliminate the need for motors and trusses on the permanent 2'' (50 mm) pipe grid to allow for more stage clearance. Rig at deck level and raise the roof with 8,000 lb (3,630 kg) of sound, lights and banners using the double-mast system.Benefit from a total roof rigging capacity of 17,500 lb (7,938 kg).
Download the Stageline SL250 technical specification & features and contact us
Operate the virtual model(QuickTime VR)
Download Quicktime
A great piece of equipment just got that much better.
Set Up time:1hr. THREE EASY STEPS AND THE STAGE IS READY FOR YOUR EVENT
The wait is over: now you can have fully hydraulic set-up at deck level for stage, sound, lighting equipment, banners and sets.
Step 1
Level the trailer and lower the floor panels. Easy hydraulic operation. | Step 2
Install sound, lighting equipment and banners at deck level. Attach up to 8,000 lb to standard 2" tube trussing in roof. (3,630 kg to 50 mm tubing) | Step 3
Raise the roof using the hydraulic double-mast lifting mechanism. |
Multiple stage configurations
Easy to expand performance area











